The Synchro Solution
Synchro Synergy

Synchro Professional

Synchro Professional provides complete construction visualisation, project scheduling, advanced risk management, synchronisation with design changes, supply chain management and cost allocation for comprehensive, virtual construction simulation.

Synchro Professional enables consideration of alternative scheduling options, resource allocation, and time and cost savings to be evaluated.

Use Synchro Professional to define and communicate to your entire construction project delivery team what, when and where work is occurring on your project.

Synchro Professional can work either standalone – managing the project model independently – or in combination with Synchro Server in managing collaborative access to a centralised project model.

Functionality

Planning

  • Synchro provides a full range of planning features:
  • Task status control Task sequencing options
  • Resource management
  • Multiple baselines to compare actual performance against your plan
  • Progress tracking
  • Rescheduling options
  • Critical path analysis.

Synchro can create risk buffers for chains of activities to protect the critical path and avoid unnecessary rescheduling as well as reduce or mitigate identified risks.

Design

Synchro resource management includes the 3D representation of material, equipment, human and space resources. The planning process can now also effectively manage task locations. Moreover, these resource representations can be synchronised with revised CAD data, as it becomes available.

Cost

Resources and tasks can be assigned fixed or variable costs, which are then displayed for selected individual or a hierarchical range of tasks, and are reported for Earned Value Analysis.

Communication

  • 80% of all we perceive is visual: Synchro exploits the power of visualisation. Synchro significantly enhances the task sequencing of the Gantt Chart with vivid time-based 3D views of the corresponding solid model at the same point in time.
  • Multiple 3D views can be presented for clarity and each can be modified interactively. This means you can improve the delivery of projects through a better understanding of site conditions and the implications of logistical plans. You can visualise and evaluate the impact of alternative construction sequences and avoid conflicts in assigned work locations.
  • Use Synchro to clarify and agree on proposed schedules with the entire delivery team, and interested parties, by sharing video simulations generated from the 3D views.

Interoperability

  • mport and export project schedules in Microsoft Office Project Standard XML file format, and import, export and synchronize with Primavera™ and Asta Powerproject.
  • Import and synchronize with DWF, DWG, HMF, HSF, HSX, IV, OBJ, PLY, STL and VRML.Import from Bentley MicroStation™ and 3D Studio Max™ via an HSF export plug-in.
  • Activity costs can be imported and a range of actual cost data can be accommodated through customised file interfaces.

Reporting

  • Generate clear and unambiguous documentation for presentations of tenders and proposals, site team meetings and management review via:
  • Task list and Gantt Chart
  • 3D views, optionally red-lined
  • Resource and task usage
  • Earned Value Analysis
  • Line of Balance view
  • Audio and Video AVI output

Deployment

  • Synchro Professional can create and modify standalone/local project files.
  • In combination with Synchro Server, Synchro Professional can also provide concurrent access to a shared project model to enable efficient and synchronised ongoing collaborative planning and problem solving.
  • Synchro can handle offline working, when there’s a temporary network communications failure, and the submission of clashing instructions from multiple contributors like the modification of a task only just deleted by a previous transaction.

Synchronisation

  • Autodesk design file updates on import
  • Bentley design file updates on import
  • Primavera API import and export
  • Asta API import and export
  • Delivery team collaborative activities
  • Supply chain collaborative activities Synchro Express

Recommended Minimum Requirements

  • 2.8 GHz Pentium 4 Processor
  • 512 MB of RAM
  • 256 MB graphics card
    (OpenGL compatible)
  • 50 MB hard disk space for installation files
    (plus 500 MB for typical standalone projects and/or temporary files)
  • 1280 x 1024 screen resolution
  • Network access to the Synchro Server port (default TCP 1200), including Internet connectivity, if external access to the project is required.

Supported Operating Systems

  • Microsoft Windows 2000
  • Microsoft Windows XP Home and Professional
  • Microsoft Windows 2003 All Editions
  • Microsoft Windows Vista
[back] [purchase]

 

Synchro Professional
Synchro Express
Synchro Workgroup
Synchro Server